Salient Features:

  • Work being done by SMC under AMRUT along the Jhelum bund
  • More areas to be identified.
  • Provides walking space and cycling areas for cycling enthusiasts and nature lovers.

Boardwalks, walkways and cycle tracks (Shivpora towards Batwara along Jhelum Bund)

Salient Features :

  • Development of water transport would enrich local tourism and promote alternate use of public transport.
  • Pilot Project to be tendered soon.
  • RFP ready for uploading
  • MOU to be signed with I&FC and
    JKTDC for operation of the project.
  • Project to be taken up on PPP basis depending upon
    the outcome / interest on the pilot project.

Jhelum Cruise for Tourism and Passenger Transport

Salient Features:

  • Construction of food court
  • Beautification of Brari Numbal road near Sheri Khas gate.Construction of pathways inside and around lagoon.
  • Construction of Kiosks in flea market.

Urban Renewal Nallah-i-Mar and Brari Nambal

Salient Features :

  • Project tendered
  • This is a new project (started in consultation with I&FC, LAWDA and SMC)
  • Currently work is going on.

Gilsar Lake Rejuvenation

Salient Features:

  • Green space development under the flyovers.
  • Beautification of the flyovers and grade separators, Including 3D Painting and other infrastructure upgrades.

Project Outcomes:

  • Environmental concerns and City beautification
  • Pressing problems regard to car parking will be taken care of by parking lots of about 250 cars
  • Kiosks to help employment and serve the catchment areas.

 

 

Beautification of Flyover, Grade Separators and other infrastructure

Salient Features :

  • Rebuilding of the Gurdwara. At Damdama Sahib.
  • After the road widening project, Gurdawara had to be dismantled and rebuilt at near by space provided.

Project Outcomes:

  • Preserving and maintaining historical Shrines as tourist and pilgrimage destinations.
  • Contributes to preservation of Culture and religious harmony and tolerance of J&K.

 

Conservation of Existing Shrines (Gurdwara at Damdama Sahib)

Salient Features:

  • Improvement and upgradation of Façade in and around of Jamia Masjid Markets.

Project Outcomes:

  • Aesthetic good looking façade upgradation around the Jamia Masjid markets would add footfall in Jamia Masjid Area.
  • Make them aesthetically pleasing.

Retrofitting and conservation of heritage network (Facade Improvement at Jamia Masjid)

Salient Features :

  • New Ablution blocks were constructed to provide the general public with good and clean facilities for ablution.

Project Outcomes:

  • More Ablution blocks provided for the worshipers.preservation of Culture and religious harmony and tolerance of J&K.

Retrofitting and conservation of heritage network (Ablution blocks at Jamia Masjid)

Salient Features:

  • Smart water meter is a fully electronic water meter that uses ultrasonic detection technology for water flow measurement.
  • The digital display screen displays the measurement data in real time, and transmits the water meter data through the data communication interface.

Project Outcomes:

  • With smart water meters, water consumption will be read automatically several times a day, and transmitted accurately and remotely back to PUB on a daily basis.

Smart Water Meters

Salient Features :

  • Will help streamline the process of power usage.
  • Smart meters will give some control to the users and the power
    department can streamline some of their process regarding supply and usage.

Smart Power Metering

Salient Features:

  • EOI issued for Bicycle Sharing under PPP  mode to ascertain interest of operators.
  • Will utilize the funds available to provide some VGF if needed.

Bicycle Sharing Scheme (Number of Cycles/Cycle Stands)

Salient Features :

  • Up gradation of 3 stadiums + 5 school grounds.
  • LED outdoor flood lightening accomplished in stadiums.

Project Outomes:

  • Stadiums were upgraded for the games to be played during night.
  • School play grounds upgraded for the students.

 

Sports Infrastructure (7 Stadia)

Salient Features:

  • Improvement in drainage system in Srinagar city.
  •  Construction of Drainage network in different areas
    of the city.

Drainage Project

Salient Features :

  • Help build a stronger community with focus on development of the downtrodden and the weak.

Project Outomes:

  • Some community based activity like SOS children, distribution of stationary,calligraphy art competition has been undertaken and
    some funds have been utilized in these projects.

Social Protection Plan and Capacity Building

Salient Features:

  • Help establish a community based task force that is trained to tackle certain tasks and help better the services provided by the government.

Project Outcomes:

  • Some community based activity like SOS children, distribution of stationary, calligraphy art competition has been undertaken and some funds have been utilized in these projects.

 

Establishment of Community Based Trained Task Force

Salient Features :

  • Training and awareness programs were conducted for the community and some activities like SOS children, distribution of stationary, calligraphy art competition has been undertaken and
    some funds have been utilized in these projects.
  • 2 lakhs spent on these activities.the weak.

Training and Awareness on response, across all stakeholders

Salient Features:

  • Structure Trolley with staircase
  • Sanitary fitting/plumbing/ wash basin
  • Trolley on wheels 
  • Excreta collection tank
  • 500 ltr. water tank with cover

Project Outcomes:

  • The Purpose of installation of portable bio digesters in the Srinagar city at various locations where there is shortage of toilet facilities, greater footfall of the tourists and other customers.
  • As a substitute for conventional septic tank for sewage disposal
  • Mixed land use
  • Sustainable use of resources
  • Revenue generation

Bio-Toilets at Major Nodes (7 Locations )

Salient Features :

  • Improving Geometry of 3 way and 4 way Junctions
  • Trench less Ducting, & Cabling etc.

Project Outcomes:

  • Reduction of traffic congestion
  • Providing safe, secure and efficient vehicular circulation/ passage inside as well as outside parking facility
  • To provide good public to amenities for residents & tourists in the area.

Junction Improvement (13 Junctions)

Salient Features :

  • 66 junctions
  • Reduce congestion, accidents, delays, improved pedestrian safety, optimization of timings at select junctions with ATCS
  • Monitoring and operations from centralised control room
  • Automated Traffic Control System which can control signals and monitor traffic in real time.
  • Green corridors
  • Vehicle detection sensor cameras mounted on junctions

Intelligent Traffic Management System /Adaptive Traffic Control System (ITMS/ATCS)

Project Outcomes:

  • Safe and secure crossing of vehicles and pedestrians at intersections.
  • Reduction of delays, conflicts, congestion and long queues with smoother flows.
  • Savings in vehicle operating cost and value of time.
  • Reducing the human and economic costs of traffic crashes.
  • Real time monitoring and reporting at centralized control centre will benefit the city residents and improve quality if life.
  • Improvement of incident response and reporting.

Adaptive Traffic Control System(ATCS)

Salient Features :

  • State of the art facility to host Smart City solutions.
  •  Project awarded to BEL
  • Video wall with war room
  • Civil infrastructure at HMT building in progress
  • Network Operations Centre
  • GIS Platform with Property Assessment Information System
  • Early Warning System
  • Web Portal and Mobile App

Salient Features :

  • Integrations with multiple departments
  • Connectivity to all junctions through SDNet.
  •  DR on cloud
  • Will host apps in future
  • Environment Sensors.
  • Solid Waste Management.
  • Smart Parking & Traffic Management.
  • Smart Governance.
  • Grievance management cell.
  • Operations Planning

Transient Integrated Command & Control Centre (ICCC)

Project Outcomes :

  • Control room for managing entire city operations Integrated sensors sharing information with decision support systems for better planning and mitigation of disasters
  • Network Operations room for monitoring various camera feeds
  • Integration of sensors with Early Warning System
  • Soft launch achieved on cloud on 12 th May 2021.

Transient Integrated Command & Control Centre (ICCC)

Salient Features :

  • Optical Fibre Network that will run throughout the city and provide high speed secured network connectivity within SMC limits.
  • SDNet will connect all the traffic lights and surveillance cameras to be implemented
    in Srinagar Smart City project

Project Outcomes:

  • DPR prepared and sent for vetting.
  • RFP to be floated after receiving the vetting report

Junction Layout Plans – Typical

Salient Features :

  • Optical Fibre Network that will run throughout the city and provide high speed secured network connectivity within SMC limits.
  • SDNet will connect all the traffic lights and surveillance cameras to be implemented
    in Srinagar Smart City project

Project Outcomes:

  • DPR prepared and sent for vetting.
  • RFP to be floated after receiving the vetting report

Transient Integrated Command & Control Centre (ICCC)

Salient Features:

  • Concrete floor with designated
    lanes.
  • In and out Barrier

Project Outcomes:

  • Utilized 0.50 Cr for this car parking at Residency Road opposite Kothi Bagh Police station.
  • 1.52 Cr to R&B for parking under flyover.
  • Other locations to be finalized and DPR to be prepared.

 

Car Parking at 7 locations

Salient Features :

  • Piling, pile caps, plinth beams, sand filling completed, 
  • Columns, share walls, slabs up to 2nd floor completed.
  • Remaining one slab and ramps to be laid.

Project Outcomes:

  • Ground + 3 Floors
  • Capacity of parking for 430 Cars and 50 Two wheelers
  • Built up Area: 35200 sq. ft
  • Total area of G+3: 136000 sq. ft
  • Done with SDA under AMRUT.

Construction of Multilevel Car Parking at Sheikh Bagh, Lal chowk in Srinagar city

Salient Features :

  • Physical progress: 85%
  • All slabs completed.
  • Mantellic flooring completed in Phase I.
  • Phase II in progress.
  • Allied Finishing items like plastering, marble flooring, outer finishing, bathroom works and paint work in progress.

Project Outcomes:

  • Ground + 3 Floors 
  • Capacity of parking for 467 Cars and 130 Two wheelers
  • Built up Area: 38000 sq.ft
  • Total area of G+3: 140000 sq.ft
  • Done with SDA under AMRUT.

Construction of Multilevel Car Parking at State Motor Garage Lal chowk Srinagar